Commit Graph

3 Commits

Author SHA1 Message Date
kgva CMS 932d7a7653 content: replace hotel national plans with the official CAD exports, add a third detail view
plan-full-ground-floor and plan-intervention-detail now come from the actual Vectorworks plan PDFs (GRUNDRISS-100.pdf, 1_20.pdf) rather than the typst-export renders — crisper linework, smaller files despite higher resolution. added plan-intervention-near.webp (from 100-NAH.pdf) as a third, medium-detail view between the full floor plan and the 1:20 intervention detail.
2026-08-11 23:01:04 +00:00
kgva CMS 68474c5940 content: finish hotel national image/text update (fa7232c only committed the binaries)
markdown still referenced the deleted plan-ground-floor.webp and lacked the tamara grabovska credit; this completes what fa7232c should have included.
2026-08-11 18:58:37 +00:00
kgva CMS 37600ccb43 content: add portfolio info.md text; refresh museo/dojo/textilsteinwerk texts and add three new projects from portfolio-2026
new: hotel national (MA studio, 2026), translation (MA collage collab. with Tim Schwander + Jérôme Arnold, 2026), utopie der koexistenz (BA thesis, Kantonsspital Baden, 2025) — text sourced from portfolio-2026.typ, translated EN<->DE, images pulled from the higher-res portfolio-export folder and converted to webp.
2026-08-10 23:20:44 +00:00